Before |
|
After stripping the paper from the
walls in this room, it became evident that the plaster was not
suitable for lining prior to repainting. As a result the
radiators and skirting were removed and the plaster was removed from
all affected areas. The wall was then repaired and readied to
accept the new paint system. |
 |
|
|
|
|
|
|
|
|
After |
|
The same room following repair,
replacement of skirting and radiators and application of new paint
system. |
 |
|
|
|
|
|
|
|
|
Before |
|
This room had suffered from damp requiring the
complete renewal of the floor joists and floorboards. Having
previously been used as a sitting room, we arranged for a plumber
and electrician to assist in the transformation works. |
 |
|
|
|
|
|
|
|
|
After |
|
The newly fitted kitchen completed and ready to
prepare dinner. The integrated fridge and freezer units are
housed beneath the breakfast bar. |
 |
|
|
|
|
|
|
|
|
Before |
|
The woodchip paper
was stripped from this staircase and the defective plaster repaired.
The uneven rounded beading to the window was replaced with new
symmetrically fixed architrave to match existing. |
 |
|
|
|
|
|
|
|
|
After |
|
The walls were lined with plain
lining paper and the original hardwood handrail was cleaned and
re-waxed. |
 |
|
|
|
|